Range Settings

Range Settings allow developers to define the minimum and maximum boundaries for the progress bar, as well as control the current progress value through a smooth animated transition.

Overview

The Range Settings feature enables customization of the progress bar's value range by exposing three primary properties: Minimum, Maximum, and Value. These properties allow the control to be adapted for different numerical scales and progress indications in .NET WinForms applications.


Feature Details

Property
Type
Default Value
Description

Minimum

double

0

Specifies the lower bound of the progress range.

Maximum

double

100

Specifies the upper bound of the progress range.

Value

double

65 (initial)

Represents the current progress value. Changing this property initiates an animated transition between values.


Key Points

Point
Explanation

Range Definition

The progress bar is configured with a defined numerical range (Minimum to Maximum).

Animated Transition

Changing the Value property triggers an animated transition effect based on the set transition effect and speed.

Boundary Enforcement

The control automatically clamps the Value property within the Minimum and Maximum limits to prevent out-of-bound values.


Best Practices

Practice
Details

Set Logical Range Values

Ensure that the Minimum and Maximum values reflect the intended progress range for your application scenario.

Use Appropriate Animation

Adjust the AnimationSpeed and TransitionEffect properties to complement the Range Settings for a smooth visual experience.

Validate Value Updates

When programmatically updating the Value property, verify that the new value falls within the defined boundaries to prevent unexpected behavior.


Common Pitfalls

Pitfall
Explanation

Incorrect Range Assignment

Setting a Minimum value greater than the Maximum value can lead to erroneous progress representation.

Overlooked Clamping

Failing to account for the control's automatic clamping might result in assumptions that the value is updated externally without the internal animation transition.

Ignoring Animation Delays

Not considering the animation duration when rapidly updating the Value property may lead to visual glitches or inconsistent transitions.


Usage Scenarios

Scenario
How to Apply Range Settings

File Download Progress

Set Minimum to 0 and Maximum to 100 to represent percentage completion, and update Value as bytes are downloaded.

Task Completion Indicator

Define a custom range (e.g., Minimum: 0, Maximum: 10) for steps in a multi-stage process, then update Value to reflect each completed stage.

Performance Metrics

Configure Minimum and Maximum based on dynamic data ranges (e.g., CPU usage from 0 to 100) and adjust Value in real time.


Code Examples

Example 1: Basic Integration

Below is an example demonstrating how to integrate and update the progress bar using the Range Settings:

using System;
using System.Windows.Forms;
using SiticoneNetFrameworkUI;

public class MainForm : Form
{
    private SiticoneHLineProgress progressBar;

    public MainForm()
    {
        InitializeComponent();
        InitializeProgressBar();
    }

    private void InitializeComponent()
    {
        this.Text = "Range Settings Demo";
        this.Size = new System.Drawing.Size(400, 200);
    }

    private void InitializeProgressBar()
    {
        progressBar = new SiticoneHLineProgress
        {
            Minimum = 0,
            Maximum = 100,
            Value = 0, // Starting at 0%
            Location = new System.Drawing.Point(20, 50),
            Size = new System.Drawing.Size(300, 14)
        };

        this.Controls.Add(progressBar);
    }

    // Simulate progress update on a button click or timer event
    private void UpdateProgress(double newValue)
    {
        // Ensure newValue is within the defined range
        progressBar.Value = newValue;
    }

    [STAThread]
    public static void Main()
    {
        Application.EnableVisualStyles();
        Application.Run(new MainForm());
    }
}

Example 2: Custom Range for Multi-Stage Task

This example shows how to use a custom numerical range to represent multiple stages of a task.

using System;
using System.Windows.Forms;
using SiticoneNetFrameworkUI;

public class TaskProgressForm : Form
{
    private SiticoneHLineProgress taskProgressBar;

    public TaskProgressForm()
    {
        this.Text = "Task Progress";
        this.Size = new System.Drawing.Size(400, 200);
        InitializeTaskProgressBar();
    }

    private void InitializeTaskProgressBar()
    {
        taskProgressBar = new SiticoneHLineProgress
        {
            Minimum = 0,
            Maximum = 5, // Assuming a task with 5 stages
            Value = 0,   // Start with stage 0
            Location = new System.Drawing.Point(20, 70),
            Size = new System.Drawing.Size(350, 14)
        };

        this.Controls.Add(taskProgressBar);
    }

    // Call this method to advance task stages
    public void AdvanceStage()
    {
        if (taskProgressBar.Value < taskProgressBar.Maximum)
        {
            taskProgressBar.Value += 1;
        }
    }

    [STAThread]
    public static void Main()
    {
        Application.EnableVisualStyles();
        Application.Run(new TaskProgressForm());
    }
}

Review

Aspect
Review Comments

Integration Ease

The Range Settings feature is straightforward to integrate, requiring minimal setup.

Customization Flexibility

Developers can easily adjust the numerical range to match various application needs.

Animation Synchronization

The automatic animated transition enhances user experience, ensuring smooth updates when the progress value changes.


Summary

The Range Settings feature provides developers with robust controls over the numerical boundaries of the progress bar. By utilizing the Minimum, Maximum, and Value properties, you can tailor the progress indicator to fit diverse application scenarios, whether tracking percentage completion, stage progression, or dynamic performance metrics. Proper configuration, combined with the control’s built-in animated transition, ensures a visually appealing and functionally sound integration into your .NET WinForms applications.


Additional Considerations

Consideration
Explanation

Testing

Always test the progress transitions under different conditions to verify that the clamping and animation behave as expected.

Combination with Other Features

The Range Settings work seamlessly with other features like Animation Settings, Color and Gradient Design, and Pulse Animation, offering a comprehensive customization suite for the control.

Performance Impact

Ensure that frequent updates to the Value property are optimized, particularly in high-frequency update scenarios, to avoid performance bottlenecks.

This comprehensive documentation for the Range Settings feature should provide a clear guide for integrating and customizing the progress bar in your applications.

Last updated